Gate 03 · Strategic Planning Architecture™

ARCHITECT — Strategy elements

What exactly is each imperative, who owns it, and how will we know it is moving?

Step 01: The Gate

Binary pass criteria. Every one, or the gate is closed.

Pass criteria

  • Every element has one named owner and a horizon date.
  • Every element carries a measure pair: one leading, one lagging.
  • Each measure has a source, a cadence and a target — no measure without arithmetic.

Evidence required

  • The element sheet: thesis, owner, horizon, measure pair, baseline.
  • Readiness status from Align™: Not Ready / Prepare / Align Candidate.

Owner: Element owner, reviewed by the executive team

Step 02: The Failure Mode

How this gate is quietly skipped.

The tell

Lagging measures only — the plan can be reported but not steered.

The counter

An element without a leading measure is not accepted onto the plan.

Step 03: The Action

Existing Compass instruments that do this work.

Not sure where to start?

Three questions, and we point you to the right instrument.

Under a minute. From this page, most leaders begin with The organization.