A minority of the work carries the result. Decide which, in writing.

80/20 is not a mood about focus. It is one ranking, read at three levels: the goals that create the weight, the programs and projects that charter it, and the three blocks the day actually holds. Work with no goal behind it is activity; a goal that reaches no project is an intention; a project that never reaches a block on a calendar is a document.

Items ranked

5

A — the vital few

2

Day blocks issued

2 / 3

Planning findings

0

The 80/20 course

The architecture

One ranking, read at three levels

01

Strategy

Where the weight comes from

Value stream goals carry the cross-functional commitment — one stream owner, one shared measure pair — and function goals carry each function's contribution. Nothing enters the ranking without a named goal behind it.

02

Program & project management

Where the work is chartered

A goal that never reaches a chartered project stays an intention. Programs and projects are the containers: scope, owner, gates, evidence. The register is what makes 80/20 auditable instead of a preference.

03

The day

Where the result is actually produced

The vital few become A-level blocks — 3 of them, by name and by hour. B-band work is scheduled but not blocked today, and C-band work is recorded so the decision not to work it is explicit.

Daily practice sheet →

The ranking is re-read on the ARC™ loop — Assess, Refine, Commit — because the vital few change as the enterprise changes. A ranking that never moves is a ranking nobody is using. Run it as a scheduled loop.

The action

Rank the candidate work

Enter candidates from both directions — goals and the active register — then score each one. Weight is impact × confidence ÷ effort; the list is sorted by weight and banded on the cumulative curve. Record owners by role, never a third party’s personal data.

Bring in an existing plan

Load a CSV of your goals or project register — a Compass 80/20 export re-imports unedited. Columns are matched by header name, so a rearranged sheet still lands. Weight, band and day blocks in the file are ignored: the ranking re-derives them from impact, confidence and effort. Owners must be recorded by role.

Headers understood: item, source, traced to, owner, measure, impact, confidence, effort, horizon.
1A — the vital fewA-level day block
5 × 5 ÷ 2 = 12.5Share 46%Cumulative 46%

Highest weight in the list at 12.5, carrying 46% of total weight. The top item is always A: something has to be first.

2A — the vital fewA-level day block
5 × 4 ÷ 3 = 6.67Share 25%Cumulative 71%

Weight 6.67 lifts the running total from 46% to 71% — still inside the first 80% of weight, so it is one of the vital few.

3B — scheduled, not today
4 × 3 ÷ 3 = 4Share 15%Cumulative 85%

The running total was already 71% before this item, so its 15% lands past the 80% line at 85% — real work, scheduled, but it does not earn a block today.

4C — named and not worked
4 × 3 ÷ 4 = 3Share 11%Cumulative 96%

By this point 85% of the weight is already committed; this item's 11% sits beyond the 95% line at 96%. It is the trivial many — named, and deliberately not worked.

5C — named and not worked
2 × 2 ÷ 4 = 1Share 4%Cumulative 100%

By this point 96% of the weight is already committed; this item's 4% sits beyond the 95% line at 100%. It is the trivial many — named, and deliberately not worked.

The audit

Why each item landed where it did

The scores as entered, the arithmetic written out, and the point on the cumulative curve where the band was set. Weight is impact × confidence ÷ effort, rounded to two decimals; share is that weight against the total of every item listed. A band that cannot be argued with is an opinion, not a ranking.

1. Install the daily production meeting and the one-page boardA
Impact
5
Confidence
5
Effort
2

5 × 5 ÷ 2 = 12.5 · 46% of total weight · 0% → 46%

Highest weight in the list at 12.5, carrying 46% of total weight. The top item is always A: something has to be first.

Scores are balanced. Position moves only if the impact claim or the effort estimate changes.

2. Cut order-to-ship lead time on the top-volume familyA
Impact
5
Confidence
4
Effort
3

5 × 4 ÷ 3 = 6.67 · 25% of total weight · 46% → 71%

Weight 6.67 lifts the running total from 46% to 71% — still inside the first 80% of weight, so it is one of the vital few.

Scores are balanced. Position moves only if the impact claim or the effort estimate changes.

3. Qualify a second supplier for the constraint componentB
Impact
4
Confidence
3
Effort
3

4 × 3 ÷ 3 = 4 · 15% of total weight · 71% → 85%

The running total was already 71% before this item, so its 15% lands past the 80% line at 85% — real work, scheduled, but it does not earn a block today.

Scores are balanced. Position moves only if the impact claim or the effort estimate changes.

4. Front-line supervisor capability buildC
Impact
4
Confidence
3
Effort
4

4 × 3 ÷ 4 = 3 · 11% of total weight · 85% → 96%

By this point 85% of the weight is already committed; this item's 11% sits beyond the 95% line at 96%. It is the trivial many — named, and deliberately not worked.

High impact carried at high effort. Cut the effort — smaller scope, a pilot, or a first slice — and the weight rises without touching the claim.

5. Rework the quoting spreadsheet layoutC
Impact
2
Confidence
2
Effort
4

2 × 2 ÷ 4 = 1 · 4% of total weight · 96% → 100%

By this point 96% of the weight is already committed; this item's 4% sits beyond the 95% line at 100%. It is the trivial many — named, and deliberately not worked.

Low impact is doing the work here. No change in effort or confidence will make this one of the vital few.

How the bands are read

A — the vital few

2 items

Carries the first 80% of weight. Blocked into the day by name and by hour.

  • Install the daily production meeting and the one-page boardProject · PRJ-014 Operating cadence install
  • Cut order-to-ship lead time on the top-volume familyValue stream goal · Order to Cash — lead time & on-time delivery

B — scheduled, not today

1 item

Real work with a date, but it does not earn a block today.

  • Qualify a second supplier for the constraint componentFunction goal · Supply — single-source exposure

C — named and not worked

2 items

Recorded so the decision not to work it is explicit rather than accidental.

  • Front-line supervisor capability buildProgram · PGM-03 Leadership capacity
  • Rework the quoting spreadsheet layoutProject · PRJ-021 Quoting tidy-up

The planning audit

No blocking findings: every item is traced to a named goal, program or project and owned by role. The ranking can be worked as a day plan.

  • Nothing to report — traced, owned and measurable.
Block the day

The discipline

Daily reminder prompts

A ranking that is never re-read stops describing the enterprise. Set the two prompts — complete the worksheet, and rerun the planning audit — then mark each one as it is honoured so the gap is visible rather than assumed.

Complete the worksheet

Due

The worksheet has not been completed on this device. Rank the candidate work and mark it done.

Rerun the planning audit

Due

The planning audit has not been rerun on this device.

Worksheet prompt
Planning audit prompt

Reminders are stored in this browser only. Export the calendar file to carry the prompts onto a phone or desktop calendar — nothing is sent anywhere from this page.

The record

Streaks, and whether the planning is actually improving

Two streaks are kept and never merged. Delivery counts consecutive days where every A block issued was worked — that is execution. Plan counts consecutive days that opened with no blocking finding — that is the quality of the thinking. A day can hold one and break the other, and which one breaks is the instruction. A day nobody closed breaks both: an unrecorded day is not a passing day.

Delivery streak

0

Longest 0 · every A block worked

Plan streak

0

Longest 0 · no blocking finding

Delivery rate (all days)

0%

0 of 0 A blocks worked

Blocking findings / day

0

Needs three days in each window to compare

Close the day

Issued blocks and open findings are read from the live ranking above, so the record cannot disagree with the plan it came from. Enter only what was worked.

A blocks issued

2

Blocking findings open

0

Warnings open

0

What the record says

  • WatchNo days closed yet. Close one day and the streaks begin; the record is what makes 80/20 auditable instead of a preference.